ARTBYLT.COM

Abstract Art Notecards

Bipolar Dementia Art Chronicles

  • "I just finished your book; it was compelling and so emotional and candid. I resonated with so many things, from large to small, and thank you for being so honest." --Nancy M. If you are interested in the life of an artist, issues of depression and bipolar disorder, or the challenges of caregiving for elderly parents, I think you will find this book a moving account of one woman's experience with all three.

    Click here for more information or purchase from Amazon.com or Barnes & Noble

« A Year of Making Art, Day 318: Exhibition Photos | Main | A Year of Making Art, Day 320: Dislocated »

A Year of Making Art, Day 319: Jazzy Improvisation

March 3, 2008  Day 319

 

Here are a few more photos from my past art exhibitions:

Morehead500  Gallery for the Arts, Mt. Sterling, Kentucky

Sohosouth1500 Adrian and Lynne, Soho South, West Palm Beach, FL

Sohosouth2500  Soho South

Tc3500  Lynne at Tompkins Cortland Community College Exhibit

Last night I was up for a couple of hours worrying.  I took a sleeping pill, but that didn't work right away, so I got up and played solitaire.  One thing I was worried about was the hassle of shipping the new prints I am offering.  They are so large that they won't fit in my Honda Element or in any ordinary van.  But as I played cards, I realized that if I couldn't find a good solution, I could just eliminate that size.

This morning Adrian solved the problem by checking with our packer, Pak-mail.  The owner has a trailer that will hold whatever size I make, and agreed to pick them up when I need her to.  Phew!

I did my drawing early today because Jim and Laura were coming over to help us move all the furniture in the studio so the new wall can be built tomorrow.  The drawing is kind of a hectic, jazzy improvisation:

Drawing325500  Drawing #325  11" x 14"

Right after Jim and Laura arrived, a tractor-trailer driver showed up at the door.  He said he was down at the main road with a delivery of flat files for me.  "We don't go on private roads," he said.  So Jim and I drove down in the Element and I backed up to the truck.  There were two skids, each very heavy, but Jim and the driver managed to get one loaded.  Then they rode on the tailgate as I drove it up to the garage, and they unloaded it.  We did the next one the same way.  I am a terrible backer-upper, but I knew I had to do it, so I did.

The good news is, it's 50 degrees out today and most of the snow and ice has turned to mush.

Why did we pick this lot to build a house and studio on?

After that adventure, we moved tons of shipping boxes into the garage, and then moved all the furniture in the studio--some to the basement, and some to one end of the studio.  Tomorrow our contractor will begin the wall, as well as coating the floor with a protective finish.

 


(Note: There is a gap between the dates I'm writing and posting in order to give me time to get ahead.)

Comments

Post a comment

If you have a TypeKey or TypePad account, please Sign In